YEREVAN — For nearly two months now, the second phase of the renovation works at the Armenian Genocide Museum-Institute has been underway. This stage focuses on restoring the inclined pylons of the Eternal Flame Memorial and repairing the roof of the administrative building. Both the museum and the memorial will remain open to visitors and official delegations throughout the renovation process. To ensure accessibility, the pylons are being restored in sequence, and work is currently in progress on the first two.

The renovations aim to resolve a decades-long drainage problem that had eroded the stone pylons, creating the risk of stone collapse, while also addressing the persistent issue of rainwater infiltration in the administrative and museum buildings.

Last year, during the first phase, improvements were made to the irrigation system of the surrounding green spaces, including the installation of a drip irrigation system in the Pine Grove.

The architectural team leading the renovation is headed by Honored Architect of Armenia, Sashur Kalashyan, one of the co-authors of the original design of the Armenian Genocide Memorial and Museum-Institute.

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Sign Up for Our Newsletters

Get notified of the latest updates from MassisPost.

You May Also Like

Human Rights Panel Highlights Importance of Accountability and Documenting Atrocities Against the Armenian People

WASHINGTON, D.C. – The Armenian Assembly of America (Assembly) kicked off its…

Kim Kardashian Starts Landmark Trip To Armenia

YEREVAN (RFE/RL) — Kim Kardashian, the world-famous U.S. reality TV star of…

UN Chief Condemns Violence in Syria, Including Armenian-Populated Kessab

NEW YORK (Armradio.am) — UN Secretary-General Ban Ki-moon on Monday urged the…

Survey of 3000 Armenians Provides a Snapshot of Opinions In the Diaspora

LONDON — The results of a major research on public opinion in…